Wind equipment handling by OOG from Jiangyin to Antwerp
Cargo Information: Wind Blades
Dimensions: 39m x 2.5m x 2.2m/15ton/baldes
Pick up: Jiangyin LM factory
Destination: Taicang port
Job Scope:
-Trucking fee from Jiangyin LM factory to Taicang terminal
-Taicang terminal port handling
Point:
-Wind blades are very long, so we use the pull-bed trailer to transportation
-We do the road survey in advance, choose the best route to avoid road obstacles
-We offloading blades at TAICANG port for storage, waiting Break Bulk vessel call berth for loading
-Arranged pull-bed trailer into Taicang port for port side trucking till under hook.